-
zhoujack posted an update 12 years, 5 months ago
Ball mill are crucial equipment for grinding after materials are crushed. It is an efficient tool for grinding various materials into powder.it is an efficien tool for grinding manyt materials into fine powder. The ball mills is usedgrind many kinds of mine and other materials, or to select the mine. It is widely used in building material, chemical industry, etc. There are twways of grinding: the dry process and the wet process. It can be divided into tabular type andflowing type according to different forms of discharging material. So how to require on the installation of energy saving ball mill ? So we must follow: (A) The operation of the air at least 12-24 hours of continuous operation time, operation found that the problem should be solved. (B)Air test machine can be normal load test run. Load test run should be carried out in stages. Load operation should be conducted as nesting feeding, to avoid unnecessary ball and cylinder liner wear loss and damage. (C)An increase in the loading and commissioning of the length of time, the size of gears and gear to the running-gear case (temperature, noise, tooth contact, etc.) as a basis for determining. Accuracy of the tooth contact does not meet the design requirements, it shall not at full capacity. As the professional manufacturer of complete sets of mining machinery, such as cone crusher, Shanghai Minggong is always doing the best in products and service. (D) The commissioning of cooling and lubrication system should be working properly. Main bearing, transmission bearing, reducer temperature should be normal. (E)Into 2 / 3 the 1027201125059ber of balls 24-48 hours after the test run, check and retighten all the bolts. (F)Commissioning work to do a good job of recording. When ball mill body was adjusted to be level, just then install the transaction parts. At first, check the quality condition of transaction parts, mainly check small gear shaft and reduction gear shaft is concentric or not. Regard the big gear wheel as the basic, then install and adjust the transaction parts, make sure the tooth width of small gear and big gear are accordant. In addition, the tooth surface of small gear and big gear also should keep accordant, the least space of gear should leave 0.25mm. the contact surface of big gear and small gear acconts for 60% of the overall length and about 40% of overall height. Get Mineral Processing,rotary kiln,ball mill From http://www.ballmill8.com